Weather June 30

The morning started out to be quite sunny. But clouds did manage to float in and we had a few minor showers, which didn’t stop us from working.

We got most of the uprights put up, ready for the lattice and we got the bottom box made for the steps from the sliding doors off the living room. The we broke for lunch.

Build Day 5 - the rain continues

Build Day 5 - the rain continues

During lunch, the skies opened up again and poured like there was no tomorrow. We decided to make our 5th trip to The Depot to pick up a few things. My bet was 4 JTs 5.

By the time we got home it was after 2pm and still raining, so we had to call it a day because tonight we are picking up our new Diesel Jetta and trading in the poor old buglette. Unfortunately, it is directly in cocktail hour. Cheers, anyway!

The New Diesel Jetta

The New Diesel Jetta

The New Diesel Jetta

The New Diesel Jetta

Read Full Post »

Weather June 29

Paul and T are on vacation and they are in Hawaii. What the heck was I thinking that on MY vacation I would build a deck? There is not one muscle in my whole entire being that is not screeming and writhing with pain. Hawaii? Pain? Hawaii? Pain? Oh ma goh!

Today we got off to another good start: Trip #4 to The Depot. We ran out of screws (we have already used 300 and need another 300, or so!) and step stringers. Thank goodness for the drill with a screwdriver bit, otherwise I think I would have thrown myself onto a large sword by now!

We got on a roll and finished the decking by 1pm, at which time, we broke for lunch. During lunch loud, cracking thunder. I look up and the skies are black. We ran to get everthing in the garage, but just before I was able to grab the tray of food, the skies opened up and buckets of water poured down. Rain like no other. Then hail. It lasted about 10 minutes and then petered out to a light rain.

Sunny One Minute to Teaming Rain the Next

Sunny One Minute to Teaming Rain the Next

It rained pretty much the entire afternoon, but we managed to skirt the deck and get the stringers strung. Lowes sent the wrong deck boards for the steps so, guess what? Yep, another trip to The Depot!

Day 4 Deck Skirt

Day 4 Deck Skirt

We’re also trying to figure out the steps from the sliding doors; they will be very tricky because the gas line for the BBQ comes our directly where the first step up is. We’ll figure it out. Here is a rendering.

Concept for Steps from Sliding Doors

Concept for Steps from Sliding Doors

And it’s that time of the afternoon again, yes, it is cocktail hour. Cheers!

Read Full Post »

Build Day 2 Weather

Build Day 2 Weather

We started off OK at 9ish, but very overcast. We made a rookie error which cost about an hour and $20 but really 5.5 hours because it started teaming rain! And, of course, Trip #3 to Home Depot.

Mother Nature Hates Us

Mother Nature Hates Us

Rain, rain and more rain. At around 2:30 the rain stopped and we immediately got back into it.

We did well, but time, energy and screws ran out (the wood kind, get your mind out of the gutter). Here is our progress today:

6:30pm Progress

6:30pm Progress

Weather permitting, we should be able to have cocktails on the new deck tomorrow! Cheers!

Read Full Post »

I am just getting too old for this type of sillyness! OHHHH my aching back.

To say Build Day 2 got off to a slow start is an understatement. Not for a lack to trying. One challenge after another. I won’t bore you with them, but suffice to say that we made our 2nd run to The Depot by 10am. JT bets 5 by the end of the build, I’m hoping for far less, but we already have the list for the next one (dare I guess 4???)

Here we are at 1pm…see what I mean about slow start?

Build Day 1 at 1pm

Build Day 2 at 1pm

We got the old fence post cut (by hand), some more demo, I moved 9 cement blocks into position, blah blah blah blah blah!

But eventually and fortunately, we got on a bit of a roll, and by 5pm we had the base box accomplished (plus dug an extra post for support).

Build Day 1 at 5pm

Build Day 2 at 5pm

Hopefully Build Day 3 will be smoother. For some god forsaken reason, both JT and I have this inhumane urge to finish quickly, even though I have the entire week off. Cocktails anyone?

Read Full Post »

We decided to get as much pre deck work done during the week as possible to allow for concentrated deck building during my time off.

Tuesday June 23 – Demo Day 1 (actually it was evening): Remove overgrown shrubs. Now THAT is manual labour. The root ball of one overgrown evergreen shrub was intensely embedded into the earth. On the plus side, we are quite fortunate that our soil is actually sand so digging isn’t that difficult!

Demo Day 1 - Remove Overgrown Shrubs

Demo Day 1 - Remove Overgrown Shrubs

Demo Day 1 - Shrub Removal

Demo Day 1 - Shrub Removal

JT did all of the demo himself during the day. It was horrible mainly because the deck was solidly built, but the temperature was absurd +30°C with high humidity. UGH!

Demo Day 1

Demo Day 2

Wednesday June 24 – Demo Day 2: I couldn’t believe what difference removing the pickets could make from looking out the living room doors — we could actually see our beautiful garden!

Demo'd

Demo'd

Jt brought the deck down in record time!

Demo Day 3

Demo Day 3

The space we gained was incredible!

Friday June 26 – Demo Day 4: JT spent removing debree so we would have space to work. That entire pile made its way to the driveway. All the new lumber which was delivered to our side yard on Thursday morning was moved into the garage to keep it safe and dry! Thanks JT, that was not the fun part!

The New Post

The New Post

Friday June 26 Evening – Build Day 1: Building a deck onto an old house does not come without its challenges. We designed the deck with a large ‘arbour’ covering our neighbour’s brick wall (see photo above). For this we planned to sink four 6″ x 6″ posts (trying to keep consistent with the existing arbour) — no-can-do! It would seem that 3 out of the four existing fence posts are directly, exactly, couldn’t be more exact space where we wanted our new posts. In cement. Did I happen to mention that the existing posts were cemented into the same exact location where we wanted our new posts! UGH! (I may be saying that and perhaps a few choice words over the next week!).

Back to the drawing board, literally! What doesn’t kill you makes you stronger. I had planned to use my brawn over the week, wanted to turn brain off….

We came up with a plan. We will retrofit the existing posts to make them ‘look’ like 6″ x 6″‘s – Obstacle 1 averted.

Unfortunately, post #2 was in the wrong place and fortunately, there was enough space to the right of it to dig a proper hole to sink another 4″ x 4″ so that we can have equal space for our lattice ‘arbour”.

And that is what we did Friday night. Of course, cockails thereafter!

Read Full Post »

When we decided to add onto our kitchen, we knew we had to give up our lovely cocktail deck JT and I built about a year or two after we moved into our home. But we had bigger plans! A new, bigger, better cocktail lounge to replace a semi useless, puney little deck off the living room! The mother of all mother cocktail lounges!

We had planned to put on this new and improved deck during the reno, but because of timing and such, we were were not able to then. We decided it was time, so I am taking a week off to help my husband build a deck. Believe it or not, I love this type of manual labour, blue job or not! A few photos for a general time line:

Pre Cocktail Area 2001

Pre Cocktail Area 2001 at the time we purchased the home

Cocktail Area Before Reno

Cocktail Area Before Reno around 2002-3

Cocktail Area During Reno

Cocktail Area During Reno 2007

Old Cocktail Area after addition

Cocktail Area after the Reno 2008

Site of the Upcoming Mother of all Cocktail Lounges

Site of the Upcoming Mother of all Cocktail Lounges

Read Full Post »